Park opened June, 2022. Trails plus bike tool station and a pump track. Open 8a-8p.
18.7 miles of single-track trails taking advantage of the new park's 600 acres of conservation land. Have fun exploring and trying out all the bike-only single-direction trails. In addition to the trails, there are several bike tool stations, a tot track, and regular-sized dirt pump track, and a .9-mile paved greenway. Catawba County Press Release: https://www.catawbacountync.gov/news/catawba-county-celebrates-opening-of-mountain-creek-park/ The Trail system was designed and built by Elevated Trail Design LLC. www.elevatedtraildesign.com
SUPER SMOOTH TRAILS. LOVE THE BERMS IN THE CURVES AND SWITCHBACKS. VERY WELL MARKED AND LARGE TRAIL SIGNS AT MAJOR JUNCTIONS
Thank |