×
|
Rate it:
Tags:
Level: Intermediate
Length: 13 mi (20.9 km)
Surface: Singletrack
Configuration: Other
Elevation: +425/ -425 ft
Total: 51 riders
Mountain Biking Noquemonon Trail Network (NTN) North Trails
#48 of 322 mountain bike trails in Michigan
Brand new trail system in construction mode! Trail follows both sides of the Dead River with multiple views of an active hydroelectric system including a massive damn and many waterfalls and bridges. Both "Collinsville Cut" and "Blue Heron Bluff" trails are out and backs but if you have local knowledge you can loop using the NTN multi use trail in the area as well as Forestville road. It is a "new school" trail using IMBA trail building techniques with berms and bench cuts. The trail system is being built by the Noquemonon Trail Network (NTN) in cooperation with the Superior Watershed Partnership and the Marquette BLP.
First added by goridemike on Jan 1, 2013. Last updated Apr 28, 2020. → add an update
Before you go
- Drinking water: unknown
- Lift service: unknown
- Night riding: yes
- Pump track: unknown
- Restrooms: unknown
- Fat bike grooming: yes
- E-bikes allowed: unknown
- Fee required: unknown
This trail information is user-generated. Help improve this information by suggesting a correction.
From downtown Marquette go north on 4th street which will change to Presque Isle Ave at fair ave, turn left on Wright street and go 1.7 miles west to Ontario ave, turn right into the Marquette Board of Light and Power parking lot and find trailhead kiosk.
Loading reviews...View more