Stacked loop trail system filled with fantastic downhill runs. In spring 2023, the third phase of development opened in Raging River, adding about 7 miles of purpose-built singletrack to this trail system. That brings the total miles of singletrack up to 32. One final phase of construction is planned, which will add an additional 7-8 miles of trail, bringing the system up to 39-40 miles.
Connector Trail | 0.2 mi | ||
Flow State | 1.2 mi | ||
Lower No Service | 0.5 mi | ||
No Service Jump line | 0.6 mi | ||
Poppin Tops | 0.9 mi | ||
Raging Ridge | 6.8 mi | ||
Return Policy | 1.8 mi | ||
Upward Mobility | 1.3 mi |
This is an awesome new trial system with a backcountry feel but still close to Seattle. Most of the trail is two direction single track and is beginner friendly. Total distance starting/ending at parking lot is 21 miles.
Thank |